HSwMS Uppland | |
---|---|
HSwMS Uppland | |
Career (Sweden) | |
Name: | Uppland |
Builder: | Kockums |
Laid down: | 21 October 1994 |
Launched: | 27 September 1996 |
Commissioned: | October 1997 |
Homeport: | Karlskrona, Sweden |
Motto: | Prudentia et audacia |
Status: | Active in service |
General characteristics | |
Displacement: | 1526 tons standard, 1647 tons submerged |
Length: | 60.4 m (198 ft 2 in) |
Beam: | 6.2 m (20 ft 4 in) |
Draught: | 5.6 m (18 ft 4 in) |
Propulsion: |
2 x 1,300 bhp (970 kW) diesel engines 2 x 75 kW Stirling engines 1 x 1,800 shp (1,300 kW) electric motor , one shaft |
Speed: |
10 kn (19 km/h) surfaced 20 kn (37 km/h) submerged |
Endurance: | over 14 days submerged without snorkeling |
Test depth: | 500 ft (150 m) |
Complement: | 20 officers, 15 enlisted |
Armament: |
4 x 533 mm (21.0 in) torpedo tubes with 12 torpedoes 2 x 400 mm (16 in) torpedo tubes with 6 torpedoes 48 external mines |
HSwMS Uppland (Upd) is a submarine in the Swedish Navy. It is the second submarine in the Gotland class. The motto of HSwMS Uppland is "Prudencia Et Audacia".
The original article can be found at HSwMS Uppland and the edit history here.