HMAS Stalwart (A304) participating in the International Fleet Review 2022
HMAS Stalwart in 2022
Career (Australia)
Ordered: 10 March 2016
Builder: Navantia
Laid down: 25 November 2018
Launched: 30 August 2019
Commissioned: 13 November 2021
Homeport: HMAS Stirling
Identification:
  • IMO number: 9816933
  • Maritime Mobile Service Identity number: 503171000
  • Callsign: VKCU
Motto: Heart of Oak
Status: Active
Badge: Ship's badge
General characteristics
Class & type: Supply-class replenishment oiler
Displacement: 19,500 tonnes (19,200 long tons; 21,500 short tons) full load
Length: 173.9 m (570 ft 6 in)
Beam: 23 m (75 ft 6 in) maximum
Draught: 8 m (26 ft 3 in)
Propulsion:
  • 2 x MAN 18V 32/40 main engines
  • 4 x MAN 7L21/31 generator sets
Speed: 20 knots (37 km/h; 23 mph)
Range: 6,000 nautical miles (11,000 km; 6,900 mi) at 13 knots (24 km/h; 15 mph)
Complement: 122
Aircraft carried: 1xMH-60R
Notes: [1]

HMAS Stalwart is the second of the Navantia built Supply-class replenishment oiler for the Royal Australian Navy. It had its keel laid in November 2018[2] as a part of the SEA 1654 Phase 3 project. HMAS Stalwart (III) and her sister ship HMAS Supply (II) replace HMAS Success and HMAS Sirius with a single class of two auxiliary oiler replenisher (AOR) ships to sustain deployed maritime forces.[3][4]

The two ships are based on the Spanish Cantabria class and were built at the Ferrol shipyard.[5] As of March 2021, the vessel began sea trials in Spain though work on her was running about eight months behind schedule. She arrived in Australia in June 2021 for her final fit out with Australian-specific equipment.[6][7] Stalwart was commissioned on 13 November 2021 at Fleet Base West.[8][9] In June 2024 Stalwart was brought into Darwin for emergency repairs due to engine trouble.[10]