m (Remove some templates. interwiki links, delink non military terms, add link to Wikipedia and cleanup, replaced: {{Citation needed|date=April 2009}} → {{Citation needed|date=November 2013}}, Image: → File:) |
m (Remove some templates. interwiki links, delink non military terms, cleanup and move Wikipedia link above categories, replaced: ==References== {{Reflist}} ===Bibliography=== * ''Guia de los buques de la Armada Argentina 2005-2006''. Ignacio Amend...) |
||
Line 5: | Line 5: | ||
|Ship caption=ARA ''Almirante Brown'' |
|Ship caption=ARA ''Almirante Brown'' |
||
}} |
}} |
||
− | {{Infobox |
+ | {{Infobox ship career |
|Ship country=Argentina |
|Ship country=Argentina |
||
|Ship flag={{shipboxflag|Argentina|naval}} |
|Ship flag={{shipboxflag|Argentina|naval}} |
||
Line 48: | Line 48: | ||
==Origin== |
==Origin== |
||
− | ''Almirante Brown'' and her sister ships were authorized under the Naval Construction National Plan of 1974, an initiative by the Argentine Navy to replace old World War II-vintage warships which were nearing the end of their operational lives.{{Citation needed|date=November 2013}} A contract was signed with the [[Blohm + Voss]] Shipyards in |
+ | ''Almirante Brown'' and her sister ships were authorized under the Naval Construction National Plan of 1974, an initiative by the Argentine Navy to replace old World War II-vintage warships which were nearing the end of their operational lives.{{Citation needed|date=November 2013}} A contract was signed with the [[Blohm + Voss]] Shipyards in Hamburg, [[West Germany]] for the construction of four MEKO 360H2 destroyers. |
==Construction== |
==Construction== |
||
Line 71: | Line 71: | ||
{{Almirante Brown class destroyers}} |
{{Almirante Brown class destroyers}} |
||
+ | |||
⚫ | |||
{{DEFAULTSORT:Almirante Brown (D-10)}} |
{{DEFAULTSORT:Almirante Brown (D-10)}} |
||
Line 78: | Line 80: | ||
[[Category:Active destroyers of Argentina]] |
[[Category:Active destroyers of Argentina]] |
||
[[Category:Gulf War ships of Argentina]] |
[[Category:Gulf War ships of Argentina]] |
||
− | |||
⚫ |
Revision as of 06:36, 21 January 2014
ARA Almirante Brown | |
Career (Argentina) | |
---|---|
Name: | ARA Almirante Brown (D-10) |
Namesake: | Adm William Brown |
Builder: | Blohm + Voss |
Laid down: | September 8, 1980 |
Launched: | March 28, 1981 |
Acquired: | February 2, 1983 |
Commissioned: | March 28, 1983 |
Status: | in active service, as of 2024[update] |
Notes: | Pennant number: D-10 |
General characteristics | |
Class & type: | Almirante Brown-class destroyer |
Displacement: | 3,360 tons |
Length: | 126 m (413 ft) |
Beam: | 14 m (46 ft) |
Draught: | 5.8 m (19 ft) |
Propulsion: |
COGAG (4 turbines) 36,000 shp (27,000 kW) |
Speed: | 30.5 kn (56.5 km/h) |
Range: | 4,500 mi (7,200 km) |
Complement: | 224 |
Armament: |
8xAérospatiale MM40 Exocet anti-ship missiles 1x Selenia/Elsag Albatross octuple launcher with 24x Aspide surface-to-air missiles 1x Oto Melara 127 mm dual purpose gun 8x Breda/Bofors 40 mm/70 anti-aircraft guns (4x twin) 6x 324 mm torpedo tubes (2x triple) |
Aircraft carried: | 1 Aérospatiale AS 555 Fennec helicopter |
Aviation facilities: | Single hangar |
ARA Almirante Brown (pennant number D-10) is the lead ship of the MEKO 360H2 series of four destroyers built for the Argentine Navy. The ship is the ninth ship in the history of the Argentine Navy to be named for Admiral William Brown, the founder and commander of the Argentine Navy during Argentina's war of independence against Spain.
The Argentine Navy struggles to meet maintenance and training requirements because of financial problems and import restrictions. The Almirante Brown class are reported to be short of spares and suffering engine problems, plus all their ordnance is past its expiry date.[1]
Origin
Almirante Brown and her sister ships were authorized under the Naval Construction National Plan of 1974, an initiative by the Argentine Navy to replace old World War II-vintage warships which were nearing the end of their operational lives.[citation needed] A contract was signed with the Blohm + Voss Shipyards in Hamburg, West Germany for the construction of four MEKO 360H2 destroyers.
Construction
The keel of Almirante Brown was laid down on September 8, 1980 and she was launched on March 28, 1981. The ship was delivered to the Argentine Navy on February 2, 1983 for her sea trials, following which the ship departed for Argentina, arriving at Puerto Belgrano Naval Base on March 21 and being formally commissioned into the Navy on March 28 of that same year.
Service history
Almirante Brown, together with the corvette ARA Spiro, was ordered to proceed to the Persian Gulf on September 25, 1990, as part of the United Nations-mandated naval blockade on Iraq following its invasion of Kuwait. The ship formed part of the multinational task force and participated on Operations Desert Shield and Desert Storm, returning to Argentina on April 25, 1991.
On April 16, 1996, Almirante Brown conducted the first trans-horizon launch of an Exocet MM-40 missile in the Argentine navy.
She is currently homeported at Puerto Belgrano as part of the Navy's 2nd Destroyer Division, along with her three sister ships.
References
Bibliography
- Guia de los buques de la Armada Argentina 2005-2006. Ignacio Amendolara Bourdette, ISBN 987-43-9400-5, Editor n/a. (Spanish/English text)
|
The original article can be found at ARA Almirante Brown (D-10) and the edit history here.